Saturday, September 26, 2026
MiningNewsTerminal
Saturday, September 26, 2026 Admin

OGG.V ·

Osisko Development Commences Surface Exploration Drill Campaign ON Copper-GOLD Porphyry Targets at Tintic Project

Exploration Programs

NYSE | TSXV: ODV NEWS RELEASE

Page 1 of 6

OSISKO DEVELOPMENT COMMENCES SURFACE EXPLORATION DRILL CAMPAIGN

ON COPPER-GOLD PORPHYRY TARGETS AT TINTIC PROJECT

Montreal, Québec, December 6, 2023 – Osisko Development Corp. (NYSE: ODV, TSXV: ODV)

("Osisko Development" or the "Company") is pleased to announce the commencement of an initial

surface diamond drilling exploration campaign to test for copper -gold-molybdenum porphyry

mineralization potential, at the Company’s Big Hill target area (Figure 2), at its 100% owned Tintic

Project ("Tintic" or the " Tintic Project"), located in the historic East Tintic Mining District in central

Utah, U.S.A. Following receipt of the required surface drill permits, the Company mobilized a diamond

drill rig from Major Drilling America of Salt Lake City, Utah, which arrived at site on December 1, 2023,

and commenced drilling activities (Figure 1).

Sean Roosen, Chairman and CEO of Osisko Development , commented, "With the surface drill

permits in hand, we are very excited to start drilling high -priority targets on the Tintic property for

copper-gold porphyry potential at depth. There was previously no detailed work completed using modern

exploration techniques in these areas and we expect the initial holes to provide us with invaluable

information to support our understanding and interpretation of the entire Tintic district and its potential

to host a copper-gold porphyry center."

PORPHYRY TARGET DRILLING

• The Tintic District, located 65 kilometers (40 miles) from Rio Tinto's Bingham Canyon Mine, has

historically been recognized as an area prospective for porphyry style copper-gold-molybdenum

mineralization. Styles of mineralization and alteration present within the Tintic District support

an interpretation of a classic porphyry -epithermal system with a high degree of rheologic and

structural control on mineralization style and distribution (Figure 3).

• Two large lithocaps , presented as anomalous surface geochemical footprints – a type of high

heat signature indicative of potential significant subsurface volcanic activity – have been

identified within the Company's Tintic Project property, namely in the Big Hill and Silver Pass

areas (Figure 2).

• An initial 3,000 meter (9,842 feet) of drilling in two holes comprises phase one of the surface

diamond drilling program.

• The objective of this surface drilling program is to test priority targets for a potential porphyry

style copper-gold-molybdenum mineral system responsible for the significant high-grade gold

and silver epithermal mineralization and past producing carbonate silver-lead-zinc replacement

deposits on the Tintic property.

• Recall, as noted in the Company's news release issued on October 11, 2023, drilling of the Trixie

West (Figure 2) high-priority potential copper-gold-molybdenum porphyry target commenced in

early October 2023 from underground at the Trixie test mine ("Trixie"). Approximately 70% of

the target drill hole has been completed to date and is nearing the projected target zone (Figure

4).

REGIONAL EXPLORATION POTENTIAL

The Tintic Project is located within the historic Tintic mining district, a cluster of base and precious metal

deposits covering greater than 200 square kilometres (~80 square miles) within the East Tintic

Mountains of north-central Utah. Commonly divided into Main, East, North, and Southwest subdistricts,

the greater Tintic District is collectively the second largest metal producing district in Utah following

Bingham (Krahulec and Briggs, 2006).

Page 2 of 6

Significant exploration potential exists for additional high sulphidation Au -Ag systems similar to Trixie,

additional "fissure zones" adjacent to historic mines such as North Lily and Eureka Standard, historic

Carbonate Replacement Deposits including Burgin, North Lily and Tintic Standard, and deep copper-

gold-molybdenum porphyry targets associated with known lithocaps such as Big Hill, Silver Pass and

Government Canyon, which have been scarcely explored by previous operators (Figure 2).

Figure 1: Diamond drill rig to test potential copper-gold porphyry mineralization set up

at the Big Hill target at Tintic Project (December 2023)

Technical Report

Information relating to the Tintic Project and the current MRE for the Trixie deposit (the "Trixie MRE")

is supported by the technical report titled "NI 43-101 Technical Report, Initial Mineral Resource Estimate

for the Trixie Deposit, Tintic Project, Utah, United States of America", dated January 27, 2023 (with an

effective date of January 10, 2023) prepared for the Company by independent representatives of Micon

International Limited (the "Tintic Technical Report"). Reference should be made to the full text of the

Tintic Technical Report, which was prepared in accordance with National Instrument 43-101 – Standards

of Disclosure for Mineral Projects ("NI 43 -101") and is available electronically on SEDAR+

(www.sedarplus.ca) and on EDGAR ( www.sec.gov) under Osisko Development's issuer profile and on

the Company's website at www.osiskodev.com.

A 3D model and virtual site tour of Trixie and the wider Tintic Project is accessible on the Company's

VRIFY page at: https://vrify.com/decks/12801.

Qualified Persons

The scientific and technical information contained in this news release has been reviewed and approved

by Maggie Layman, P.Geo., Vice President, Exploration of Osisko Development, and a "qualified person"

within the meaning of NI 43-101.

Page 3 of 6

Figure 2: Lithocap highlights of porphyry target areas and drill pad locations

Page 4 of 6

Figure 3: Generalized conceptual deposit model of a high sulphidation epithermal

porphyry system

Figure 4: Trixie West porphyry target drill hole status

Page 5 of 6

ABOUT OSISKO DEVELOPMENT CORP.

Osisko Development Corp. is a premier North American gold development company focused on high -

quality past-producing properties located in mining friendly jurisdictions with district scale potential. The

Company's objective is to become an intermediate gold producer by advancing its 100%-owned Cariboo

Gold Project, located in central B.C., Canada, the Tintic Project in the historic East Tintic mining district

in Utah, U.S.A., and the San Antonio Gold Project in Sonora, Mexico. In addition to considerable

brownfield exploration potential of these properties, that benefit from significant historical mining data,

existing infrastructure and access to skilled labour, the Company's project pipeline is complemented by

other prospective ex ploration properties. The Company 's strategy is to develop attractive, long -life,

socially and environmentally sustainable mining assets, while minimizing exposure to development risk

and growing mineral resources.

For further information, visit our website at www.osiskodev.com or contact:

Sean Roosen Philip Rabenok

Chairman and CEO Director, Investor Relations

Email: [email protected] Email: [email protected]

Tel: +1 (514) 940-0685 Tel: +1 (437) 423-3644

CAUTION REGARDING FORWARD LOOKING STATEMENTS

Certain statements contained in this news release may be deemed "forward -looking statements" within the meaning of the United

States Private Securities Litigation Reform Act of 1995 and "forward-looking information" within the meaning of applicable Canadian

securities legislation (together, "forward -looking statements"). These forward-looking statements, by their nature, require Osisko

Development to make certain assumptions and necessarily involve known and unknown risks and uncertainties that could cause

actual results to differ materially from those expressed or implied in these forward-looking statements. Forward-looking statements

are not guarantees of performance. Words such as "may", "will", "would", "could", "expect", "believe", "plan", "anticipate", "intend",

"estimate", "continue", or the negative or comparable terminology, as well as terms usually used in the future and the conditional,

are intended to identify forward -looking statements. Information contained in forward -looking statements is based upon certain

material assumptions that were applied in drawing a conclusion or making a forecast or projection, including the assumptions,

qualifications and limitations relating to the significance of the high -priority target drilling; the utility of mod ern exploration

techniques; the potential of Tintic to host a copper -gold porphyry center; the significance of regional exploration potential; the

results in the Tintic Technical Reports; the capital resources available to Osisko Development; the ability of the Company to execute

its planned activities; the ability of the Company to obtain future financing and the terms of such financing; management's

perceptions of historical trends, current conditions and expected future developments; the utility and sign ificance of historic data,

including the significance of the district hosting past producing mines; future mining activities; the timing and status of permitting;

the results (if any) of further exploration work to define and expand mineral resources; the ability of exploration work (including

drilling) to accurately predict mineralization; the ability to generate additional drill targets; the ability of management to understand

the geology and potential of the Company's properties; the ability of the Compa ny to expand mineral resources beyond current

mineral resource estimates; the ability of the Company to complete its exploration objectives for its projects in 2023-24 in the timing

contemplated (if at all); the ongoing advancement of the deposits on the C ompany's properties; the deposit remaining open for

expansion at depth and down plunge; the ability to realize upon any mineralization in a manner that is economic; the ability to adapt

to changes in gold prices, estimates of costs, estimates of planned ex ploration and development expenditures; the ability of the

Company to obtain further capital on reasonable terms; the profitability (if at all) of the Company's operations; the Company being

a well-positioned gold development company in Canada, USA and Mexico; sustainability and environmental impacts of operations at

the Company's properties; as well as other considerations that are believed to be appropriate in the circumstances, and any o ther

information herein that is not a historical fact may be "forwar d looking information". Material assumptions also include,

management's perceptions of historical trends, the ability of exploration (including drilling) to accurately predict minerali zation,

budget constraints and access to capital on terms acceptable to the Company, current conditions and expected future developments,

regulatory framework remaining defined and understood, results of further exploration work to define or expand any mineral

resources, as well as other considerations that are believed to be appropriate in the circumstances. Osisko Development considers

its assumptions to be reasonable based on information currently available, but cautions the reader that their assumptions regarding

future events, many of which are beyond the control of Osisko Development, may ultimately prove to be incorrect since they are

subject to risks and uncertainties that affect Osisko Development and its business. Such risks and uncertainties include, amo ng

others, risks relating to capital market conditions and the Company's ability to access capital on terms acceptable to the Company

for the contemplated exploration and development at the Company's properties; the ability to continue current operations and

exploration; regulatory framework and presence of laws and reg ulations that may impose restrictions on mining; the ability of

exploration activities (including drill results) to accurately predict mineralization; errors in management's geological modelling; the

ability to expand operations or complete further explora tion activities; the timing and ability of the Company to obtain required

approvals and permits; the results of exploration activities; risks relating to exploration, development and mining activitie s; the

global economic climate; metal and commodity price s; fluctuations in the currency markets; dilution; environmental risks; and

community, non-governmental and governmental actions and the impact of stakeholder actions. Readers are urged to consult the

disclosure provided under the heading "Risk Factors" in the Company's annual information form for the year ended December 31,

2022 as well as the financial statements and MD&A for the year ended December 31, 2022, which have been filed on SEDAR+

(www.sedarplus.ca) under Osisko Development's issuer profile and on the SEC's EDGAR website ( www.sec.gov), for further

information regarding the risks and other factors applicable to the exploration results. Although the Company's believes the

expectations conveyed by the forward-looking statements are reasonable based on information available as of the date hereof, no

assurances can be given as to future results, levels of activity and achievements. The Company disclaims any obligation to up date

any forward-looking statements, whether as a result of new information, future events or results or otherwise, exc ept as required

by law. Forward-looking statements are not guarantees of performance and there can be no assurance that these forward -looking

Page 6 of 6

statements will prove to be accurate, as actual results and future events could differ materially from those anticipated in s uch

statements. Accordingly, readers should not place undue reliance on forward-looking statements.

Neither the TSX Venture Exchange nor its Regulation Services Provider (as that term is defined in the policies of the

TSX Venture Exchange) accepts responsibility for the adequacy or accuracy of this news release. No stock exchange,

securities commission or other regulatory authority has approved or disapproved the information contained herein.